| University | National University of Singapore (NUS) |
| Subject | ME4212: Aircraft Structures |
ME4212 Aircraft Structures
Fig. 1 shows the structural layout of the wing of a small aircraft. The structure consists of a front and rear spar with spanwise stringers. You may assume the leading edge cell ahead of the front spar and the structures behind the rear spar are ineffective in carrying stresses; hence the structure is a one-cell beam with multiple stringers. A vertical load 𝑉௭ = 18.0 × 10ଷ
lb. is applied to Stringer 4 at Station 190, as indicated by the red arrow in Fig. 1.
Fig. 2 shows the cross-section at Station 20, with information on the dimensions of the 14 flanges or stringers. The reference axes are labeled X’ and Z’, while the centroidal axes are labeled X and Z. Table 1 shows the positions of the stringers.
Determine the maximum bending stress and shear stress at Station 20. State all assumptions and your answers in metric units


Buy Custom Answer of This Assessment & Raise Your Grades
Are you an engineering student and facing difficulties with mechanical engineering assignments? Looking for someone who can do my assignment? If so, you are in right place. We are the popular engineering assignment help service providers in singapore. Hire professional report writer to get finish your ME4212 Aircraft Structures Report at the normal price.
Looking for Plagiarism free Answers for your college/ university Assignments.
- 303SD Structural Steel Design Project Brief Report SEM 2 | Ngee Ann Polytechnic
- Security Risk Management Individual Project Assignment | SIT
- 63MBID Information Management and Digital Intelligence Coursework | UNAM
- BA8081 Innovation Management Individual CA 2 AY2024/25 SEM 2 | Singapore Polytechnic
- 7005MHR Leadership: Towards Mastery of Leading Change and Inclusivity Assignment Rubric
- PSB7005CL Leadership: Towards Mastery of Leading Change and Inclusivity Assignment Brief – Nov 2025
- BBS67 Principle of Finance Individual Assignment | The University of Melbourne
- EPAE102 Aircraft Materials and Hardware Documentation Project 1 | TP
- EPAE101 Aircraft Maintenance Practices Documentation Project 1 | TP
- 7WBS2008 Strategic Marketing Planning and Entrepreneurship Assignment CW 2
