University | Temasek Polytechnic (TP) |
Subject | Aviation Management |
CASE STUDY
Even today, the Beech Starship looks a futuristic aircraft when placed alongside modern general aviation business aircraft. With its swept canard wings, two rearward-facing turbo-prop engines, a mostly all-composites structure and a proposed speed of 350 knots, the idea for the development of what was to become the Beech Starship was driven in 1979 by competition and the need to find a replacement or ‘Next Generation Business Aircraft (NGBA)’ to Beech’s successful King Air which was by then 15 years old.
Before Beech could progress further with the NGBA, the company was sold to the conglomerate Raytheon. During the transition to new management, Raytheon using its Beech Aircraft organization began to examine the NGBA in 1981. Work progressed from a proof-of concept (POC) to a flying prototype.
Despite many problems in development causing schedule slippages and increase in weight, the first product Beech Starship reached the market in 1989 to a less than lukewarm reception. The aircraft failed to meet design expectations and only 50 production aircraft were built. Despite its commercial failure, the Beech Starship has many lessons in project management (PM).
You can start your research into the Beech Starship here:
Remember though that this is one person’s opinion, and not a project manager’s opinion. It does not necessarily have to be your opinion.
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Brilliant experts Of SingaporeAssignmenthelp.Com deliver wonderful Case Study Help Online on Aviation Management. We have a productive team of case study writers who are highly experienced professionals to provide authnetic case study solution on aviation project management assignment at a cheap price.
Looking for Plagiarism free Answers for your college/ university Assignments.
- HRM331: Talent Management – Strategic Shift from the War for Talent to the Wealth of Talent
- Marginalised Populations – The Structural and Cultural Exclusion of People Experiencing Homelessness in Singapore
- CVEN3501 Assignment 2: Groundwater Modelling of Drawdown from a Pumping Bore
- CSCI312 Assignment 2: Conceptual Modelling and Implementation of a Data Warehouse and Hive Queries
- CH2123 Assignnment : Fugacity, VLE Modeling & Henry’s Law Applications
- BAFI1045 Assignment -Constructing and Evaluating Passive and Active Portfolios Based on the Straits Times Index (STI)
- PSB501EN Assignment 1: Engineering Systems Integration: A Multi-Technique Approach to Mechanical Analysis
- FIN2210E/FIN2212E Group Assignment: Financial Risk Management Analysis of Bursa Malaysia Companies
- FLM101 Assignment: A Cinematic Dissection: Stylistic Elements and Their Thematic Significance
- Assignment: Transforming Talent in the AI Era: From War to Wealth through Ecosystem Innovation