BCA Academy (BCAA) Questions

Looking for Plagiarism free Answers for your college/ university Assignments.

DCS030: Your group is required to prepare and present a detailed report recommending a DfMA technology for a project as part of the tender requirement: Anatomy of Buildings, Group Assignment, BCA Academy

Assignment Brief: Your group is required to prepare and present a detailed report recommending a DfMA technology for a project as part of the tender requirement. The report should aim to achieve higher productivity by reducing construction time and manpower on-site. The report should include comprehensive analysis and recommendations based on the

Identify 5 different building materials(e.g. concrete, timber) or elements(doors, windows etc.) in the mall: Construction Material, Assignment, BCA, Academy

Choose a Shopping Mall in Singapore (E.g. Junction 8, NEX etc.) Identify 5 different building materials(e.g. concrete, timber) or elements(doors, windows etc.) in the mall.  For each of the identified building material/element, write a short paragraph on: i) The type of material /element. ii) Advantages of this material / element. iii) Disadvant

Looking for Plagiarism free Answers for your college/ university Assignments.

This assignment is about a case study of a 5-story Wafer Fabrication Plant. The WFP is located 20m above mean sea level: Certificate in Mechanical & Plumbing Systems Assignment, BCAA

This assignment is about a case study of a 5-story Wafer Fabrication Plant. The WFP is located 20m above mean sea level. Each story is 4m high. 3rd floor: Assuming cleanroom areas are Bay 7 to 10 where test tools/devices are installed as shown in Figure 1. The area enclosed in the bigger red box has a floor area of about 750 m2. The toilets are

Design and Build Space and Facilities not limited to Cable Containment, Power Provisions, Grounding Provisions, Fiber Termination Points: Specialist Diploma in M&E Coordination Assignment, BCCA

1) Design and Build Space and Facilities not limited to Cable Containment, Power Provisions, Grounding Provisions, Fibre Termination Points 2) Preparation of Cable Containment Shop Drawing, Request for Information. Project: Proposed construction of 6-story senior care and nursing home building. Introduction This GROUP assignment (4 to 5 persons

Download Free Solved Assignment & Essay Samples for Singaporeans

Convincing Features
Plagiarism Free Report
On-Time Delivery
Native Writers
A+ Quality
100% Confidential
24*7 Online Assistance

Get these features included in Your Assignment